NEW OFFICE Clinton, TN "World" Headquarters Rancho Dominguez, CA

Fire & Pump Service Group
Fire & Pump Service Group
  • Home
  • Mission Statement
  • About US
  • NQA-1 and CGD
  • Videos & Photos
  • Products
  • FPSG Hybrid-Pac®
  • Technical Information
  • Career Job Descriptions
  • More
    • Home
    • Mission Statement
    • About US
    • NQA-1 and CGD
    • Videos & Photos
    • Products
    • FPSG Hybrid-Pac®
    • Technical Information
    • Career Job Descriptions
  • Home
  • Mission Statement
  • About US
  • NQA-1 and CGD
  • Videos & Photos
  • Products
  • FPSG Hybrid-Pac®
  • Technical Information
  • Career Job Descriptions

ASME NQA-1

Dedication Commercial Grade -Safety Significant/ Class

Download PDF

Commercial Grade Dedication

The Company Story

 With thousands of items dedicated, Fire & Pump Service  (FPSG) has the historical data, technical acuity, and required experience to dedicate commercial grade items for use in safety-related applications and qualified inventory in stock.  These items can be purchased and dedicated on a turn-key basis, or dedication services can be conducted on customer-provided specimens.


Fire & Pump Service (FPSG)  analyzes, tests, and qualifies materials and components under its Quality Assurance Program, which adheres to 10CFR50/Appendix B and ASME NQA-1. 


FPSG also offers analysis, testing, and qualification to Off the Shelf, Graded, Safety Significant and Safety Class.



 

CGD Services

Capabilities

Testing Capabilities As a complete qualification center, FPSG’s qualification tests adhere to industry standards. Environmental and seismic qualification processes include:

  • Technical evaluation
  • Plan development
  • Customer approval of qualification plan
  • Qualification testing
  • Analysis
  • Final qualification report

Qualification Tests

  • Cycle Aging, repetitive stress, and relief, incorporate      temperature
  • Failure Means Effect Analysis (FMEA)
  • Functional Tests
  • Hardware Critical Design Review
  • Humidity Aging
  • Mechanical/Electrical Cycling
  • Normal Service Radiation Exposure
  • Plant-Induced Vibration (Vibration Aging)
  • Radiation Testing
  •  Seismic Qualification, Seismic Design Category;  SDC 2 - SDC 4 
  • Software Verification & Validation (V&V)
  • Thermal Cycle Aging
  • Qualified A2LA and 17025 Laboratories 
  • V and V, Verification and Validation  Software
  • Finite Element Analysis, Seismic, Vibration, Movement



Testing Capabilities

               

Fire & Pump Service (FPSG) dedication process includes a detailed Dedication Procedure, which contains the following:

  • Technical evaluation
  • Definition of critical characteristics for acceptance      (based on safety function)
  • Acceptance criteria
  • Acceptance test procedures and data sheets

When the required testing is finished, the following documentation will be provided:

  • Final Report
  • Travelers
  • Certificate of Conformance




              FPSG Codes & Standards

                      See Next Section

                          Pages   1 thru 6

Fire & Pump Service Group (FPSG) CGD Codes & Standards

Download PDF

Mechanical Components FPSG has Performed CGD Services:

Download PDF

Copyright © 2023 Fire & Pump Service Group - All Rights Reserved.

Powered by GoDaddy Website Builder

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept

 


Click to See Power Point MagOx Presentation EFCOG Nov 8, 2022 Idaho Falls